Datasheet

EC1 Plus
Flexmörtel

Flexible and plastic-coated cemented thin-bed mortar in accordance with EN 12 004 C2 TE-S1 for laying ceramic tiles and panels, porcelain tiles (internal), porcelain mosaics, clinker and brick tiles, as well as colour fade and deformation resistant natural stone coverings for internal and external use. For use on solid surfaces such as in situ concrete (min. 6 months old), gypsum fibreboard, plaster boards, heated screeds (in compliance with corresponding standards and data sheets), cast asphalt, porous concrete and balconies and terraces. Suitable for coating thicknesses up to 10 mm.

Meets "Flexible mortar guidelines", June 2001 version

The underfloor must be dry, clean and stable. If laying on insecure substrates the area size must be limited by expansion joints. In indoor areas, pre-coat absorbent substrates with Okatmos® GG, Okatmos® DSG, Okamul SP or Okatmos® UG 30. Allow at least 24 hours to dry on calcium sulphate screeds, or use Okatmos® DSG.

When installing covering material with a surface of > 0.16 m² and an adhesive bed thickness of more than 5 mm on calcium sulphate screeds, prime using Okatmos® DSG or Okapox GF.

Outdoors, prime with Okatmos® UG 30 or Okatmos® DSG. On old, horizontal floor coverings that have been cleaned with alkaline floor cleaner and primed with Okatmos® UG 30 or Okatmos® DSG, always work in conjunction with a compound seal, such as Servoflex DMS 1K-schnell SuperTec or Servoflex DMS 1K Plus SuperTec.

Mix ServoStar® 1500 with clean water until smooth. Leave to stand for approx. 5 minutes and then mix again. Using the appropriate trowel (see table) spread the mixture onto the substrate and place and firmly press down the material being laid after no more than approx. 30 minutes. Depending on the absorbency of the substrate/coating, the laid material can be adjusted within approx. 25 minutes.

When used outdoors or in larger formats, the combined method (buttering-floating) should be followed.

Color

grey

Application

inside and outside**, on walls and floors

Thickness of the application

max. 10 mm

Temperature tolerance

+5 °C to +25 °C (substrate)

Temperature tolerance

-20 °C bis +80 °C

Water demand

approx. 7.5 litres / 25 kg powder

Slack time

approx. 5 minutes (then mix once again)

Processing time*

approx. 2.5 hours

Open time (working)

approx. 30 minutes

Walkable* / ready for grouting*

Absorbent substrates: after approx. 12 hours

Non-absorbent substrates: after approx. 24 hours

GISCODE

ZP 1 - low in chromate, in accordance with TRGS 613

EMICODE

EC 1Plus in accordance with GEV

Storage

in closed original container approx. 12 months in dry rooms

At +20 °C and 65 % rel. humidity Higher temperatures lower this value, and lower temperatures increases it correspondingly.

** 

Outdoors largely cavity-free laying is required (buttering-floating).

Tooth depth of the notched trowelConsumption (powder)
3 mm (TKB C3)approx. 1,0 kg/m²
4 mm (TKB C1)approx. 1,2 kg/m²
6 mm (TKB C2)approx. 1,8 kg/m²
8 mm (TKB C4)approx. 2,4 kg/m²
10 mm (TKB C5)approx. 3,0 kg/m²
per mm of coating thicknessapprox. 1,2 kg/m²

Consumption depends, among other factors, on the condition of the substrate.

Surfaces and tools to be cleaned immediately with water.

 

Product descriptionItem no.Item no.
42 x 25 kg paper sack131164015705131160

The aforementioned information, especially the proposals for processing and utilizing our product, is based on our knowledge and experience. We recommend that you carry out your own tests in every case to ensure the suitability of our products for the intended process and processing purposes because of the different materials and the working conditions which lie beyond our area of influence. No liability can be derived from this advice or from verbal advice, unless we are responsible for (criminal) intent or gross negligence in this respect.


Revised: 11.06.2026/ag