Datasheet

[Translate to English:]
EC1_GB_black

Solvent-free, very low emission, two-component, polyurethane resin adhesive for the installation of LVT, PVC coverings in highstress and high temperature areas, rubber coverings, outdoor and other hard to adhere coverings. Okamul PU has superior bonding properties. Humidity and weather resistant after it has fully hardened.

The substrate must comply with the national requirements relevant to country for installation. The surface substrate must be sound and clean. Remove dirt, paint, oil, grease wax or any other contamination which might act as a bondbreaker.


Prime absorbent, porous and dusty substrates with Okapox GF. Level uneven areas with Servoplan leveling compounds. Use Servoplan S 111 leveling compound for industrial (fork lift traffic) areas.

Empty entire hardening fluid (part B) into the main container of part A component. Mix the two components together thoroughly with an electric mixer until the mixture is without streaks. Repot and stir again.

 

Use an appropriate notched trowel to apply Okamul PU onto the substrate. On very smooth substrates we recommend to use a fine pointed notch trowel to avoid surplus adhesive being pressed through the joints.

Ensure full transfer of adhesive into the installed covering. Install the covering within 30 minutes and roll down firmly. Repress after approx. 2 hours. Do not allow product to form a skin. Once this occurs disgard remaining product.

Color

beige

Application

interior and exterior

Suitable for chair castors (DIN EN 12529)

suitable

Minimum floor temperature

59 °F (+15 °C)

Mixing ratio

component A and B - complete mix

Processing time*

approx. 60 - 70 minutes

Skin over time* / Tack time

install immediately into wet adhesive

Walkable*

after approx. 24 - 48 hours

Final strength*

after approx. 3 - 5 days

Floor heating system

suitable

GISCODE

RU 1 according to TRGS 610

EMICODE

EC 1 according to GEV

Storage

Store in dry area for up to 12 months in unopened container.
Preferred storage temperature: +10°C to +20°C.
Please note EC safety data sheet.

At 68 °F (+20 °C) and 65% relative humidity.
Higher temperature and low humidity decreases, lower temperature and high humidity increases this value respectively.

Only for qualified installers.

AUSTRALIA / NEW ZEALAND   
Trowel notch Coverage 
A1 approx. 322 - 368 sq.ft./US gal.
(350 - 400 g/m²)
 
B1 approx. 215 - 258 sq.ft./US gal.
(500 - 600 g/m²)
 
B3 approx. 99 - 143 sq.ft./US gal.
(900 - 1300 g/m²)
 
U1 approx. 2,5 m² - 3 m² per kg 

 
  
Trowel notchBack of the coveringCoverage 
TKB A1/A2smooth / textured
e.g. Rubber, Vinyl, LVT coverings
approx. 300 - 350 g/m² 
TKB B1rough / textured
e.g. Sports floor, Rubber-Granulate-Underlayments
approx. 400 - 450 g/m²  
TKB B3rough
e.g. Outdoor coverings, with profiled backing
approx. 600 - 650 g/m²  
TKB B3mosaic parquet (DIN EN 13488)
Okavlies Renovation Fleece
Kiesel underlayment
approx. 700 - 900 g/m²  
TKB B7industrial parquet (DIN EN 14761)
Ready-to-use-parquet in short planks (DIN EN 13489)
approx. 1000 - 1200 g/m²  
TKB B15Okaphone insulating boardsapprox. 1300 - 500 g/m²  

Clean tools immediately with Bakit RT cleaning wipes.

Product descriptionItem no.Item no.
52 x 6 kg two-component container603604015705603605
52 x 3 kg* two-component container802464015705802466
* Only AUS/NZ

The aforementioned information, especially the proposals for processing and utilizing our product, is based on our knowledge and experience. We recommend that you carry out your own tests in every case to ensure the suitability of our products for the intended process and processing purposes because of the different materials and the working conditions which lie beyond our area of influence. No liability can be derived from this advice or from verbal advice, unless we are responsible for (criminal) intent or gross negligence in this respect.


Revised: 11.04.2019/me